PROJECTS
Click the type of project below to see a short overivew including the services provided, results of the effort and a link to more project specific details.
PDEngineering has real-world experience with on-site and off-site projects, new installations, refurbishments and maintenance.
Various types of projects are listed below to demonstrate our capabilities and achievements.
If you would like more information about a specific project or related facility, please contact us at 1-800-515-4620 or email .
- Boiler Aux Equip Design & Install
- Boiler Combustion Process Improvement
- Construction Management
- Control System Upgrade
- General Mechanical Engineering
- Instrumentation History Record Database
- Instrumentation Testing and Maintenance
- Operator HMI Graphics Designer
- Operator/Technician Training
- Permitting and Environmental Compliance
- Process & Controls Tuning
- Process Design Modifications
- Project Coordination
- Project Startup & Commissioning
- Reverse Engineer Existing Control Logic
- Software Testing
- Troubleshooting and/or Equipment Assessment
- Turbine Wet-Nox Water Injection
- Unit Restoration Management
- Unit Trip Testing
General Mechanical Engineering
The application of engineering theory for the use in performing evaluations of mechanical systems.Mechanical Engineer
Provide mechanical engineering services on client's processes and systems.PROJECT: Biomass Fueled Gas Turbine Project Assessment• Performed numerous engineering thermodynamic cycle process evaluations to determine approximate cycle efficiencies, load capacities, and overall performance of specific components.
PROJECT: Correctional Complex Feasibility Study Review• Completed a boiler capacity calculation for the scenario of reducing the operating pressure from 60 psig to 15 psig on a 100 HP Cleaver Brooks package boiler.
• Conducted a thermodynamic analysis of three different steam energy supplies to determine if a 15 psig steam boiler could be used to supply heating steam to a portion of their facility, why the current system is working, and why a 5psig system didn't work.
• Conducted an engineering analysis on the hot water heat exchanger in a large commercial facility hydronic heating system. Analysis included thermodynamic comparison of performance between 30 to 15 psig steam supply.
• Used an adiabatic compressible flow modelling software program to verify pipe diameters for large and small bore steam piping for the facilities steam energy system. Compared the two operating pressure scenarios of 60 psig versus 15 psig operation.